environmental consulting
Environmental and Land Use Permitting
​
-
Habitat Assessments and Mitigation Plans
-
Shrubsteppe Mitigation Plans
-
Mule Deer Management and Mitigation Plans
-
Setback Variances
-
Riparian Variances
-
Buffer Reductions
-
Comprehensive Plan Amendments and Zone Changes
-
Land Use Permitting
-
Shoreline Permitting
-
Critical Areas Permitting
-
Conditional Use Permits
​
-
Building Permits
-
Violation Resolution
-
Residential and Commercial Permitting
-
Clean Water Act
-
Section 10/404 Permits
-
Plant Surveys and Vegetation Monitoring
-
Talus Slope Habitat Surveys
-
Feasibility/Pre-Purchase Site Assessments
-
Ordinary High Water Mark (OHWM) Determinations
-
Stream Typings​
Permitting
​
-
Regulatory Compliance (Ecology, Local Health)
-
Engineered Reports
-
Hydraulic Modeling
-
Collection System
-
Large Onsite System (LOSS)
-
Lift Stations, Controls, and Structures
-
System Rehabilitation
Docks and Shoreline Permitting
-
Residential and Commercial Docks
-
Marinas
-
Boat Lifts
-
Jet Ski Lifts
-
Seawalls and Bulkheads
-
Shoreline Access Trails
-
Shoreline Substantial Development Permits
-
Shoreline Variances
-
Shoreline Conditional Use Permits
-
Aquatic Land Leases
-
Mooring Buoys
-
Swim Floats
-
Non-Conforming Building Replacement
-
Boat Launches
-
Shoreline Armoring and Bank Stabilization
-
Dredging and Disposal
-
Pile Replacement
-
Mitigation Planning and Construction
-
Key Words
-
Recovery
-
Restoration
-
Repair
-
Mitigation
-
Shoreline
-
Stream
-
Creek
-
River
-
Lake Chelan
-
Lake Wenatchee
-
Columbia River
-
Shrub Steppe
-
Sagebrush
-
Forest / Forestry
-
Violation
-
Resolution
-
Water Quality
-
Survey
-
Monitoring
-
Mammal
-
Wildlife
-
Fisheries
-
Botany / Botanist / Biologist
-
Natural Resources
-
Ecology / Biology
-
Compliance
-
Endangered Species Act (ESA)
-
Assessments
-
Population
-
Characterization
-
Construction
-
Maintenance
-
Community Dock
-
Joint-use dock
-
Single-use dock
-
Property
-
Development
-
United States Army Corps of Engineers (USACE / CORPS)
-
Washington Department of Fish and Wildlife (WDFW)
-
Public Utility District (PUD)
-
Chelan County
-
Douglas County
-
Okanogan County
-
Grant County
-
Kittitas County
-
Residential and Commercial
-
Department of Ecology
-
Washington Department of Fish and Wildlife
-
Department of Natural Resources
-
Central/Eastern Washington Permitting
-
Riparian Variances
-
SEPA/NEPA
-
Clean Water Act
-
Section 10/404
-
Central/Eastern Washington County Permitting
-
Riparian Variances
Soil Remediation
-
Historical Orchard Soil Testing and Remediation Planning (Lead & Arsenic Testing, Pb/As)
-
Department of Ecology Permitting for Single-Family Construction, Residential Subdivisions, and Commercial Development Using the Model Remedies for Cleanup of Former Orchard Properties
-
Pre-Development Consultation and Remediation Planning
-
Voluntary Cleanup Program Permitting and Compliance
-
XRF Soil Testing
-
Ecology-Approved Site Characterization Testing and Reporting
-
Ecology-Approved Remedial Action Plans and Reports
-
Construction Site Monitoring
Wetlands
Empower
Growth
​
-
Delineation Reports
-
Category Ratings
-
Fill Permits
-
Mitigation Plans
-
Buffer Reductions / Determinations
-
Variances
-
Shoreline Assessments
-
Critical Area Assessments and Compliance
-
Feasibility Assessments
-
Building Permits